Building a Green Windows Home Server

Microsoft’s The Power of Software blog has a post about Building a Green Home Server.

Building a Green Windows Home Server

And now for something a little different. So far we have focused on the energy costs of datacenters, but since patterns & practices is a development team, we obviously have a lot of team members that have, shall we say, a little hardware at home as well.

Ade Miller, our development manager, has an interesting series of posts on his blog describing his foray into building an energy efficient Windows Home Server to back up his other PCs, serve music, and act as a print server. You can read the series starting at http://www.ademiller.com/blogs/tech/2008/09/building-a-windows-home-server-choosing-the-hardware/.

I went to Ade’s site, and he has some good information.  At the end Ade asks a good question, How Green is It’? When I saw he was going to get a kill-a-watt to measure power I contacted him and told him I’d loan him my Smart Watt device.  Given Smart-Watt uses .NET and a sql express database, I knew Ade would find it much more useful to create power consumption graphs.

Read more

VMWare Tip, Ignore VNIC bandwidth reported

VMware’s Guy Brunsdon provides a tip for VMware users that the reported VNIC speed 100Mbps is not representative of the true NIC speed.

vnic bandwidth? ... ignore what the guest VM tells you!

I was speaking with a customer recently about networking when the topic turned to the virtual nic or vnic bandwidth available between a VM and the virtual switch. The customer complained that the server guys  were performing "gymnastics" in trying to change the speed from its reported value of 100Mbps to a more palatable speed of 1Gbps.

Fortunately, one of our senior engineers was present at the meeting and was able to explain (more completely than me) that the bandwidth *reported* by the guest VM on the vnic interface is a function of the NIC driver on the guest VM (e.g. e1000, vlance, etc). The actual vnic is implemented in software, so is only limited by the processing capabilities of the host itself.

So, ...ignore what the guest reports as the NIC link speed ...(and bad on us for not making this more apparent!)

p.s. if you *do* want to set a limit on the traffic produced by a VM, you can use the "TX Rate Limiting" feature in the Port Group definition. Here you can set the maximum and average bandwidth as well as a "burst" size.  

Read more

Floating Nuclear Plant Failed Attempt in 1970s

A blog reader submitted a comment.

Offshore Power Systems was going to build and deploy floating commercial reactors back in the seventies. In fact one of the largest cranes in the world was built in Jacksonville FL in the late seventies where the completed plants could be launched and then towed to there operating sites. Unfortunately one of the greatest President's ever banned any new Nuclear Power Plants in this country! So the crane stood on the Jacksonville skyline as a monumnet to ignorance until the mid 1990s when the chinese bought it dismantled and moved it to China!

Made me curious and found this article in Atomic Insights on Offshore Power Systems attempt to build floating nuclear plants..

Most people associated with the nuclear industry, and many residents of Florida have some knowledge of the ill-fated Westinghouse/Newport News Offshore Power System project.

Begun in 1970, this project was based on two ideas. The first was that a series of identical reactors produced in a factory type setting could be completed in a shorter period of time than a similar number of custom made plants constructed on site. The second was that plants located several miles off shore might be able to avoid the infamous Not In My Backyard (NIMBY) syndrome that had begun to plague power plant developers.

Basic Plant Design

By 1970, Westinghouse executives realized that one of the main problems in making nuclear plants competitive was the fact that they were all custom built plants. Company engineers began producing some conceptual designs for smaller, modular plants and checking the reaction of utility executives to the designs.

At Public Service Electric and Gas, based in New Jersey, the designers found some strong interest in standardized plants. However, Richard Eckert, the main proponent of such plants, had some suggestions of his own.

He suggested that the plants should be utility sized, i.e. on the order of 1000 MWe, and constructed so that they could be moored off shore. As the man in charge of finding new sites for power plants, he had discovered that there were a very limited number of sites available in areas where power demands were high. He realized, however, that many such areas were close to the ocean.

After some give and take between the supplier and the customer, the plant design that evolved was essentially a man-made island that could support two 1200 MWe nuclear plants. The power island would be fabricated in a specialized facility, maneuvered to the site and permanently moored behind a large, protective breakwater. Ideally, the plant would be located a bit less than three miles off shore and the power would be sent via underwater cables.

It is ironic what doomed the floating nuclear plant was the 1973 oil embargo which decreased the demand for electricity.

Cancellations

With all of the positives going for this project, it is important to understand why it failed. Surprisingly enough, the initiating event was the OPEC oil embargo of 1973. Typically, an event that leads to a rapid quadrupling of the price of a competitive product is good for business, but the energy industry does not follow normal rules.

The major industrial loads on the Public Service system were oil refineries and petrochemical plants located in places like Newark, New Jersey. The embargo dramatically reduced the demand for their products, so they reduced their purchases of electricity.

Since Public Service's customers needed less electricity, they did not need the capacity represented by the two large plants that they had ordered from Offshore Power Systems. Even though the purchase contracts required them to cover the supplier's costs, including those of building the manufacturing facility, Public Service desperately needed to slow down their capacity additions.

At first Public Service asked for a two year delay, hoping that the "energy crisis" was temporary, but they eventually canceled all orders.

Since the plants and the facilities that had been designed were specifically designed for the production of 1200 MWe central station power plants for the densely populated and prosperous Northeast United States, there was little hope of finding alternative customers. This was unfortunate, since many areas of the world were desperate for moderately sized, non-oil based electric power sources.

Since no business - no matter how good their people, their facilities or their technology - can survive without customers, Offshore Power Systems closed down. The people associated with the project were either relocated or found other employment. Westinghouse sold the Blount Island facility.

The project became a bad memory for many in the nuclear industry, most of whom do not understand the business reasons for the closure. They simply remember that Westinghouse tried floating power plants and failed to produce a single plant. Unfortunately, many industry pessimists see this as a reason to believe that any project based on similar ideas is doomed to fail.

Read more

Intel Atom Dual Core Home Server

Windows Home Server Site has news about Tranquil’s Intel Atom Dual Core Home Server.

Tranquil PC Launch Intel Atom 330 Based Home Server and Media Center

Mon, Sep 8, 2008 | Terry Walsh

Tranquil PC Launch Intel Atom 330 Based Home Server and Media Center

Whilst the rest of the world is getting to grips with the new Intel Atom low power/low cost processor, the UK’s Tranquil PC have skipped ahead and will very shortly launch Windows Home Server and Windows Media Center based machines running the even newer Intel Atom 330 processor!

The 330 is a 1.6GHz dual core, dual wafer chip which, according to Tranquil,  displays as 4 x CPU history streams in Task Manager, and is 64-bit compatible, which really is a must-have for potential future versions of Windows Home Server.

Acording to The Register, the 330 will come soldered onto Intel’s new D945GCLF2 mobo, a mini-ITX board based on the 945GC chipset and GMA 950 integrated graphics.

The new Windows Home Server specification is served up in a special blue edition of Tranquil’s T7 chassis, called the T7-HSG which comes complete with the new processor and an upgrade to Gigbit LAN. The standard black chassis is also available as an option. Base price is £299 +VAT, with upgrade options available across RAM and Storage.

The Tranquil site has some details, but they are not shipping yet.

T7-HSG

Introducing the T7-HSG the ultimate compact home server appliance. The unit, running Windows Home Server, is a smart hub to connect, protect and share your photos, videos, music and important files. Powered by the latest Intel Atom 330 Dual core CPU, this Home Server delivers outstanding performance, coupled with low power consumption. This high quality unit will be at home anywhere, similar in size to a typical hard back dictionary. With wall mount option, it can be secured out of sight and out of mind. Supporting 4x external HDDs, this is an excellent Server start up option. Why not couple it with the slot on T7-HDx units (and have up to 9TBs of storage).

Read more

DataCenterKnowledge and WSJ, Moving Resources to lower costs

DataCenterKnowledge and WSJ write on the same subject today on moving resources around for optimization.

Hot spots in Motion from DataCenterKnowledge.

“The technology that delivers the most benefits for business but causes the most headaches for operation is virtual machine live migration,” writes Andreas Antonopoulos of Nemertes in a post titled “Dude, where’s my server?” An excerpt:

Live migration, also known as VMotion or XenMotion in the VMWare and Xen products respectively allows you to move virtual machines from physical server to physical server without any discernible interruption. … Wonderful features for business agility. But by making virtual machines mobile this feature makes troubleshooting even harder. Add the other features and you might have machines moving around automatically and constantly.

Andreas notes that tracking and managing VMs is critical to trouble-shooting. Moving virtual machines from server to server within a data center creates another challenge: as the computing load migrates, so does the heat load. A box that is underutilized one minute can become a high-density server in short order.

Retailers move employees to best times to maximize revenue from WSJ.

Retailers Reprogram Workers
In Efficiency Push

By VANESSA O'CONNELL
September 10, 2008; Page A1

LANGHORNE, Pa. -- Retailers have a new tool to turn up the heat on their salespeople: computer programs that dictate which employees should work when, and for how long.

AnnTaylor Stores Corp. installed a system last year. When saleswoman Nyla Houser types her code number into a cash register at the Ann Taylor store here at the Oxford Valley Mall, it displays her "performance metrics": average sales per hour, units sold, and dollars per transaction. The system schedules the most productive sellers to work the busiest hours.

[Retailers Reprogram Workers in Efficiency Push]

Shoshannah White for The Wall Street Journal

Ann Taylor saleswoman Nyla Houser, a retired teacher, has gotten fewer work hours under a new 'workforce-management' system.

"We are under the gun to be a much more efficiently running organization," said Scott Knaul, director of store operations at the women's apparel retailer, which said earlier this year that it is closing 117 underperforming stores over the next few years. There was an initial "ego hit" for some employees, he said at a gathering of retailers in May. But the system, he said, has helped turn more store browsers into buyers.

DataCenterKnowledge points out the problem with heat, but the WSJ wants the opposite to turn up the heat, and drive sales.

Let’s hope a retailer doesn’t get a job in a data center, confuse the objective, and try to make the most expensive machines the hottest ones. :-) 

But, it does bring up an interesting issue with virtualization, should environmental conditions be part of the criteria for evaluating a VM move? 

I’ve always laughed at whenever I hear vendors like Microsoft and VMware talk about dynamic data center initiatives, and how things will just move automatically.  Wait.  Too much change creates chaos, and makes it hard to optimize. Every transition is an opportunity for failure.

Read more