Unknown Environmental Impact of Dam Removal

Data Centers built next to dams are assumed to have low cost power using renewable energy.  In the Pacific Northwest, Hydroelectric is not classified as renewable energy, and dams are viewed by many environmentalists as damaging.

A year from now the largest dam removal project will start on the Elwha River in the pacific Northwest. There are many environmentalists who champion dam removal.

Many of the dams in the eastern U.S. were built for water diversion, agriculture, factory watermills, and other purposes that are no longer useful. Because of the age of these dams, over time the risk for catastrophic failure increases. In addition, many of these dams block anadromous fish runs, such as Atlantic salmon and American shad, and prevent important sediments from reaching estuaries.

Many dams in the western U.S. were built for agricultural water diversion in the arid country, with hydroelectric power generation being a very significant side benefit. Among the largest of these water diversion projects is the Columbia Basin Project, which diverts water at the Grand Coulee Dam. The Bureau of Reclamation manages many of these water diversion projects.

Dams in the Pacific Northwest and California block passage for anadromous fish species such as Pacific Salmon and Steelhead. Fish laddersand other passage facilities have been largely ineffective in mitigating the negative effects on salmon populations. Bonneville Power Administration manages electricity on 11 dams on the Columbia River and 4 on the Snake River, which were built by the Army Corps of Engineers.

Seattletimes covers the largest dam removal project scheduled to start next year.

Elwha River's coming dam removal has scientists flooded with unknowns

Scientists see much to learn when two dams come down on the Elwha River, beginning about a year from now in the largest dam removal project ever in North America

By Lynda V. Mapes

Seattle Times staff reporter

PREV 2 of 2 NEXT

Enlarge this photo

ELWHA RIVER, Clallam County — From all over the country they came to ponder this river: its gravel, its teal-green waters, its shores and mouth and mostly its future as the site of the largest dam-removal project ever in North America.

Sweeping north from Mount Olympus to the Strait of Juan de Fuca, the Elwha has been collared by two dams since the early part of the 20th century. Both will be taken out chunk by chunk, releasing some 18 million cubic yards of sediment impounded along with the river's flow. The process will take about three years, beginning next June.

With $350 million allocated for the project.  There is no money for scientific research in the budget.

Oddly, for its importance, Elwha research is a shoestring effort. The $350 million federally funded restoration project includes no money for scientific study. So as they toured the river corridor, the scientists were framing potential research questions to propose for funding by agencies, universities and other sources.

The environmental impact of dam removal at this scale is unknown.

"It's the first time anyone has done a staged, step-by-step dam removal of this scale," Randle said. "It's the largest controlled release of sediment ever in North America, and a very different process than we've seen elsewhere."

So how do you the decision makers and environmentalists know the dam removal is better for the environment?  It would seem logical that how the dam gets removed has a huge influence on the impacts to issues brought up in the article.

"We built a model of this, but I've never actually stood on it," said Gordon Grant, research hydrologist with the U.S. Forest Service research station in Corvallis, Ore. "How does the river adjust to the change in level? You have a tiger by the tail, and the only knob you have to turn is how quickly you take it down. What's upstream will drive what is downstream, and that is what makes this such a juicy problem.

"I can't think of another analogue anywhere for the experiment this river is going to be. It's a natural laboratory unlike any other."

It will take three years to remove the dam and many more years to see the environmental impact.

What is environmental impact of dam removal?  We don't know.

Read more

Application of Video Analysis, future data center capability

I am having a blast with this helmet cam idea.  People are so excited they want to figure out how to use this as a differentiator, and ask to not tell others.  I could have gone down the money pit path of trying to patent a helmet cam idea applied to data centers, but that would have just put lots of money in the hands of patent attorneys.

A demonstration of the use of video analysis is in this Fast Company article.

Made to Stick: Watch the Game Film

BY: DAN HEATH AND CHIP HEATHJune 1, 2010

Old Classroom, Dan Heath, Chip Heath, Max Wolfe

Photograph by Max Wolfe

Dan Heath and Chip Heath ask, Have you been looking closely enough at your business?

Related Content

RELATED LINK

Made to Stick: Presentations that Stick

Football Coaches pore over game film to spot things they'd never see in real time. Check it out: When the defense blitzes, the free safety picks up the running back. So by picking off the safety, the middle of the field will be wide open for a screen pass. The value of this meticulous observation is intuitive in the sports world. After all, coaches get a week to review a 60-minute game. In the organizational world, where every day is game day, such analysis is less common. It's unfortunate because studying the game film can yield unexpected insights.

The application highlighted is in teaching.

Lemov suspected there was technique underneath the teaching magic -- and if he could find it, he could teach it. So he identified a classic top-5% teacher at North Star Academy in Newark, New Jersey, and asked if he could observe the class. Lemov's buddy, a wedding videographer, agreed to record the teacher in action (a welcome relief from the Electric Slide).

Five years later, having recorded and analyzed hundreds of hours of videotape, Lemov has some answers. In his new book, Teach Like a Champion: 49 Techniques That Put Students on the Path to College, Lemov reveals what he learned. As he expected, great teachers have a lot in common. For instance, star teachers circulate around the whole space of their classrooms. They are always within seconds of being at the shoulder of any student in the room. Less experienced teachers rarely "broke the plane," the imaginary line running between the blackboard and the first row of student desks.

One of the books I am reading now is Teach like a Champion.

Top Five Things Every Teacher Needs to Know (or Do) to Be Successful
Amazon-exclusive content from author Doug Lemov

1. Simplicity is underrated. A simple idea well-implemented is an incredibly powerful thing.

2. You know your classroom best. Always keep in mind that what’s good is what works in your classroom.

3. Excellent teaching is hard work. Excellent teachers continually strive to learn and to master their craft. No matter how good a teacher is it’s always possible to be better.

4. Every teacher must be a reading teacher. Reading is the skill our students need.

5. Teaching is the most important job in the world. And it’s also the most difficult.

Read more

ARM Servers in Data Centers is inevitable

I've been discussing ARM servers in data centers for a while and now it is becoming common in media to ask when will ARM have servers in the data center.  GigaOm is one of those keeping up the momentum.

For ARM, It’s Server Side Up

By Om Malik Jul. 29, 2010, 6:00pm PDT 4 Comments

0

Ian Drew, executive vice president of marketing at ARM Holdings, a Cambridge, U.K.-based company that makes semiconductors powering a majority of the smartphones, tablets, 70 percent of world’s hard drives and half the world’s printers, is on a whirlwind tour of Silicon Valley. And what everyone (including me) wants to talk to him about is servers, or rather low-power server chips that can power the data centers of tomorrow.

It's not just media, but customers are interested in low power servers.

And what Drew and his cohorts are seeing is a radical revolution in the data centers. “While the x86 world focused on pure megahertz, we have focused on the megahertz per milliwatt,” Drew said during our conversation earlier today. “We focus on quarter-to-half milliwatts as a key metric.” Most of the new devices such as the iPhones don’t have heat sinks in them, he joked.

I think about 2 years ago I was talking to ARM about why they should go into the server business for data centers.  Now they are comfortable making their own pitch on why.

“If you look at our heritage (of low power chips) it makes perfect sense for us to be looking at the servers and the data centers,” said Drew. With “cooling” making up nearly half the capital expenditure and almost two-thirds of the operation expenses, Drew said power is going to be a bigger part of the conversation.

“Everyone is using the Web and the Web is more demanding today which means all of the stuff is going to run through data centers,” he noted. “Two things are very clear: there is going to be a lot of data and need for less power.” By getting the world to buy more edge devices (iPhones, iPads etc.), ARM is at the same boosting demand for back-end computing infrastructure. Now by diversifying into the data center server business, it can make more money selling its low-power chip technology to server makers. In other words, ARM wins on both sides of the trade.

and GigaOm is even watching Microsoft to look at ARM for data centers.

We also reported on a Microsoft job listing that sought a software development engineer with experience running ARM in the data center for the company’s eXtreme Computing group. For the last couple of decades, Intel’s x86 chips have gained dominance in the data center, but as power considerations begin to outweigh the benefits of a cheap, general purpose processor, other chip makers have started to smell blood. Nvidia is pushing its graphics processors for some types of applications, while Texas Instruments is researching the use of DSPs inside servers.

but, as ARM cautions, don't expect product soon.  This is a long term game for ARM, 2 years or more before we see servers in mass.

But don’t expect this to happen overnight, Drew cautioned. “We are going to see some pilots over next year, but this is a long term initiative.” He believes that this long, continuous transition to lower-power server chips is going to take between three to five years. When I asked Drew what are those pilots, he declined to comment. From our reporting, we can easily tell you Microsoft, Smooth Stone and Marvell are experimenting with ARM-based server processors.

Read more

Worldwide www.greenm3.com visitors

For 6 months I have been using www.clustrmaps.com to see the global reach of this blog.  Here is a map of the last 6months and the 186 countries that have hit this blog.

Thanks for continuing to visit this blog.  What you read influences what I write next.

-Dave Ohara

image

Here are the 186 countries.

1 United States (US)
2 United Kingdom (GB)
3 India (IN)
4 Canada (CA)
5 France (FR)
6 Germany (DE)
7 Australia (AU)
8 Netherlands (NL)
9 Japan (JP)
10 Singapore (SG)
11 Taiwan (TW)
12 Italy (IT)
13 Spain (ES)
14 Brazil (BR)
15 China (CN)
16 Korea, Republic of (KR)
17 Malaysia (MY)
18 Philippines (PH)
19 Sweden (SE)
20 Belgium (BE)
21 Hong Kong (HK)
22 Ireland (IE)
23 Europe (EU)
24 Poland (PL)
25 South Africa (ZA)
26 Switzerland (CH)
27 Turkey (TR)
28 Finland (FI)
29 Indonesia (ID)
30 Romania (RO)
31 Denmark (DK)
32 Russian Federation (RU)
33 New Zealand (NZ)
34 Thailand (TH)
35 Mexico (MX)
36 Israel (IL)
37 Pakistan (PK)
38 Portugal (PT)
39 Czech Republic (CZ)
40 Iran, Islamic Republic of (IR)
41 Norway (NO)
42 Egypt (EG)
43 Saudi Arabia (SA)
44 Ukraine (UA)
45 Austria (AT)
46 Greece (GR)
47 Hungary (HU)
48 United Arab Emirates (AE)
49 Argentina (AR)
50 Colombia (CO)
51 Bulgaria (BG)
52 Vietnam (VN)
53 Chile (CL)
54 Asia/Pacific Region (AP)
55 Holy See (Vatican City State) (VA)
56 Iceland (IS)
57 Slovakia (SK)
58 Peru (PE)
59 Slovenia (SI)
60 Lithuania (LT)
61 Sri Lanka (LK)
62 Croatia (HR)
63 Serbia (RS)
64 Latvia (LV)
65 Estonia (EE)
66 Costa Rica (CR)
67 Qatar (QA)
68 Venezuela (VE)
69 Jordan (JO)
70 Bangladesh (BD)
71 Puerto Rico (PR)
72 Nigeria (NG)
73 Luxembourg (LU)
74 Kenya (KE)
75 Kuwait (KW)
76 Lebanon (LB)
77 Tunisia (TN)
78 Morocco (MA)
79 Ghana (GH)
80 Ecuador (EC)
81 Bahrain (BH)
82 Malta (MT)
83 Oman (OM)
84 Nepal (NP)
85 Jamaica (JM)
86 Trinidad and Tobago (TT)
87 Dominican Republic (DO)
88 Uruguay (UY)
89 Macedonia (MK)
90 Mauritius (MU)
91 Algeria (DZ)
92 Cyprus (CY)
93 Bosnia and Herzegovina (BA)
94 Georgia (GE)
95 Belarus (BY)
96 Mongolia (MN)
97 Sudan (SD)
98 Brunei Darussalam (BN)
99 Syrian Arab Republic (SY)
100 Senegal (SN)
101 Guatemala (GT)
102 Albania (AL)
103 Uganda (UG)
104 Kazakstan (KZ)
105 Paraguay (PY)
106 Bolivia (BO)
107 Libyan Arab Jamahiriya (LY)
108 Cambodia (KH)
109 Maldives (MV)
110 Tanzania, United Republic of (TZ)
111 Mozambique (MZ)
112 Macau (MO)
113 Yemen (YE)
114 French Polynesia (PF)
115 Palestinian Territory (PS)
116 Armenia (AM)
117 Cote D'Ivoire (CI)
118 Cameroon (CM)
119 Isle of Man (IM)
120 Panama (PA)
121 Ethiopia (ET)
122 Honduras (HN)
123 Fiji (FJ)
124 Myanmar (MM)
125 Guyana (GY)
126 El Salvador (SV)
127 Moldova, Republic of (MD)
128 Reunion (RE)
129 Iraq (IQ)
130 Cuba (CU)
131 Angola (AO)
132 Nicaragua (NI)
133 Suriname (SR)
134 Jersey (JE)
135 Guadeloupe (GP)
136 Namibia (NA)
137 Botswana (BW)
138 Zimbabwe (ZW)
139 Bahamas (BS)
140 Netherlands Antilles (AN)
141 Azerbaijan (AZ)
142 Monaco (MC)
143 Rwanda (RW)
144 Bermuda (BM)
145 Cayman Islands (KY)
146 Grenada (GD)
147 Barbados (BB)
148 Greenland (GL)
149 Saint Kitts and Nevis (KN)
150 Montenegro (ME)
151 New Caledonia (NC)
152 Martinique (MQ)
153 Guernsey (GG)
154 Virgin Islands, British (VG)
155 Saint Vincent and the Grenadines (VC)
156 Papua New Guinea (PG)
157 American Samoa (AS)
158 Anguilla (AI)
159 Guam (GU)
160 Afghanistan (AF)
161 Benin (BJ)
162 French Guiana (GF)
163 Liberia (LR)
164 Guinea (GN)
165 Micronesia, Federated States of (FM)
166 Somalia (SO)
167 Tajikistan (TJ)
168 Madagascar (MG)
169 Swaziland (SZ)
170 Andorra (AD)
171 Aland Islands (AX)
172 Djibouti (DJ)
173 Solomon Islands (SB)
174 Burkina Faso (BF)
175 Belize (BZ)
176 Antigua and Barbuda (AG)
177 Virgin Islands, U.S. (VI)
178 Antarctica (AQ)
179 Haiti (HT)
180 Montserrat (MS)
181 Dominica (DM)
182 Gibraltar (GI)
183 Gambia (GM)
184 Kyrgyzstan (KG)
185 Saint Lucia (LC)
186 Bhutan (BT)
Read more

Could you work for Software Executives? IBM reorgs HW to be under SW

Data Centers organizations are interesting to watch as many problems for how data centers get designed and run are influenced by the organizational structure.  Jonathan Eunice guest writes on CNET News regarding IBM's reorg of HW under SW.

IBM's reorg shows shape of IT to come

by Jonathan Eunice

I'm always wary of analyzing corporate organizations and reporting structures. They change frequently--every year or two, in some companies--so they're always in flux. And the details of who reports to whom, or what they want to call this business unit or that--those things matter, a bit, but not nearly so much as the products and services a company offers, how it goes to market, who its competitors are, and so on. Finally, company structures are very "inside baseball"--the kind of detailed who's-on-first, who's-warming-up-in-the-bullpen information that industry insiders may find interesting, but that isn't really all that useful to most customers or investors.

But I'm going to make an exception here because the changes going on at IBM illustrate important structural changes in IT overall, how vendors approach the market (and each other), and what customers can expect from IT providers in the coming years.

The news is as simple as it is astounding: IBM's Systems and Technology Group (STG)--the unit that makes IBM's mainframes, Power and x86 servers, storage, and microprocessors--will henceforth report into the IBM Software Group (SWG). Strictly speaking, IBM hasn't been "a hardware company" for nearly 20 years. Software and services have grown up to be, both in terms of revenue and industry footprint, what the company's about. Everyone who's looked at IBM or industry finances realizes this. Still, when you started thinking about IBM as "a computer company" all those years ago, it's hard to fully internalize the idea that it's no longer really "a computer company."

Google has all its data center infrastructure and hardware report up to Urs Hoelzle.

Urs Hölzle is senior vice president of operations and Google Fellow at Google. As one of Google's first ten employees and its first VP of Engineering, he has shaped much of Google's development processes and infrastructure.

Urs being a SW guy looks at data centers as a computer for Google Software.

Before joining Google, he was an Associate Professor of Computer Science at UC Santa Barbara. He received a master's degree in computer science from ETH Zurich in 1988 and was awarded a Fulbright scholarship that same year. In 1994, he earned a Ph.D. from Stanford University, where his research focused on programming languages and their efficient implementation.

As IBM follows Google's model to have hardware report to a VP who is a software guy, it will be interesting to watch who follows the model.

And the world's changing. Enterprises are much more likely to start their IT planning and acquisitions with what they want and need to accomplish, not with pre-determinations of what hardware they'll run it on. That's a shift in customer thinking that benefits those focused on software and services. It similarly benefits those who consider non-IT issues such as financing, demand generation, and partner ecosystems equally important to products and services. IBM definitely thinks this way, about "the whole package," and not just about computers, or any other single element.

This is one way to bridge IT and Facilities.  Put it all under a software executive.

Read more